Each production facility is audited by a qualifed independent third party professional engineer in order to ensure that plants, equipment, materials, material handling, product and delivery/mixer trucks have met the minimum prescribed qualifications, and that the proper "capability" of producing quality concrete exists as per Canadian Standards Association A23.1-09 - Concrete Materials and Methods of Concrete Construction, and A23.2-09 - Methods of Test and Standard Practices for Concrete.
SAMPLE REPORTS
© Copyright 2011 Ready Mixed Concrete Association of Ontario